العربية English

Official website of Makita in Qatar

🇶🇦    

UNPLUG YOUR TILT-UP JOB SITE

Learn how Makita® cordless solutions can eliminate the hassle and expense of power cords from each phase of tilt-up construction.

MAKITA® SOLUTIONS FOR THE COMPLETE TILT-UP PROCESS

Jump to a phase to learn more

1

FORMWORK

Forms are laid out upon the slab to outline the walls and features, such as windows, of the panels.

ALIGNMENT &MEASUREMENT

Once the casting surface, also known as floor slab or pad, has cured, tilt-up panels can be created. Panels are measured and outlined in preparation for the formwork.
RECOMMENDED PRODUCTS: LASERS, DISTANCE MEASURING TOOLS
 

CUTTING

Dimensional lumber is often used to outline the edges and features of panels. Forms for the panels are laid out on the slab along the chalk lines.
RECOMMENDED PRODUCTS: CIRCULAR SAWS, RECIPROCATING SAWS
 

FASTENING

Holes are drilled into the formwork, then nails or glue are used to keep the formwork in place.
 

INSTALLING EMBEDDED ITEMS

Caulking is used to secure rustication, inserts, or embeds, such as structural supports and lifting hardware, to the panels.
RECOMMENDED PRODUCTS: CAULKING GUNS
 

CLEAN-UP

Prepare the surface by removing debris.
RECOMMENDED PRODUCTS: BLOWERS

2

REINFORCEMENT

Tilt-up panels are constructed with steel components for structural integrity.

REBAR CUTTING

Rebar is used to strengthen the walls and cut to size.
 

REBAR TYING

The rebar is laid down inside the form in a grid and secured together with wire.
RECOMMENDED PRODUCTS: REBAR TIERS

3

CONCRETE PLACEMENT & TREATMENT

Concrete is poured into the forms to the desired thickness.

CONCRETE CONSOLIDATION

Concrete vibrators are used to level concrete and remove entrapped air. This process helps ensure consolidation under and around embedded items.
RECOMMENDED PRODUCTS: CONCRETE VIBRATORS
 

WATER AND DUST REMOVAL

Remove any excess water or debris from panel surfaces and edges.
RECOMMENDED PRODUCTS: BLOWERS, VACUUMS

4

ERECTING & BRACING

Panels are raised by a crane, moved into position, set on the foundation, and adjusted into final placement with shims. Once a panel is in place, temporary braces are set to support the panel until the roof is attached.

DRILLING FOR ANCHOR

Rotary hammer is used to drill a hole for the anchor that will secure the brace.
RECOMMENDED PRODUCTS: ROTARY HAMMERS
 

ANCHOR FASTENING

Impact Wrench is used to fasten the panel brace to the floor.
RECOMMENDED PRODUCTS: IMPACT WRENCHES

5

FINISHING & CLEAN-UP

Various trades visit the job site to complete the interior and exterior of the structure.

CONTROL &EXPANSION JOINT CUTTING

Expansion joints are made to allow for the dynamic movement of the concrete that occurs due to ambient temperature variances and/or movement of the soil from seismic activity.
 

SLURRY CLEAN-UP

Vacuums and dust extractors can be used to remove slurry created during polishing, cutting, or grinding.
RECOMMENDED PRODUCTS: VACUUMS
 

REMOVING IMPERFECTIONS AND OVER POURS

During the pouring process, concrete may cure in an imperfect manner if a form dislodges. Those imperfections are then removed first with demolition or rotary hammers.
RECOMMENDED PRODUCTS: DEMOLITION HAMMERS, ROTARY HAMMERS

 

CAULKING JOINTS & FILLING CRACKS

Joints and cracks should be filled before casting the panels.
RECOMMENDED PRODUCTS: CAULKING GUNS
 

CONCRETE SURFACING

After removing imperfections, the panel is smoothed with angle grinders or concrete planers.
RECOMMENDED PRODUCTS: ANGLE GRINDERS, CONCRETE PLANERS

 

CLEAN-UP

Prepare the surface by removing debris.
RECOMMENDED PRODUCTS: BLOWERS, VACUUMS, ACCESSORIES

    Ask for a Demonstration
    Book a Demo!

        Become A Partner
        Wholesale / Trade? Get in touch

          For Complaints

            Get A Quote / Get Advice

              Ask for a Demonstration
              Book a Demo!

                  Become A Partner
                  Wholesale / Trade? Get in touch

                    For Complaints

                      Get A Quote / Get Advice