UNPLUG YOUR TILT-UP JOB SITE
Learn how Makita® cordless solutions can eliminate the hassle and expense of power cords from each phase of tilt-up construction.
MAKITA® SOLUTIONS FOR THE COMPLETE TILT-UP PROCESS
Jump to a phase to learn more
1
FORMWORK
Forms are laid out upon the slab to outline the walls and features, such as windows, of the panels.
ALIGNMENT &MEASUREMENT
Once the casting surface, also known as floor slab or pad, has cured, tilt-up panels can be created. Panels are measured and outlined in preparation for the formwork.
RECOMMENDED PRODUCTS: LASERS, DISTANCE MEASURING TOOLS
CUTTING
Dimensional lumber is often used to outline the edges and features of panels. Forms for the panels are laid out on the slab along the chalk lines.
RECOMMENDED PRODUCTS: CIRCULAR SAWS, RECIPROCATING SAWS
FASTENING
Holes are drilled into the formwork, then nails or glue are used to keep the formwork in place.
INSTALLING EMBEDDED ITEMS
Caulking is used to secure rustication, inserts, or embeds, such as structural supports and lifting hardware, to the panels.
RECOMMENDED PRODUCTS: CAULKING GUNS
CLEAN-UP
Prepare the surface by removing debris.
RECOMMENDED PRODUCTS: BLOWERS
2
REINFORCEMENT
Tilt-up panels are constructed with steel components for structural integrity.
REBAR CUTTING
Rebar is used to strengthen the walls and cut to size.
REBAR TYING
The rebar is laid down inside the form in a grid and secured together with wire.
RECOMMENDED PRODUCTS: REBAR TIERS
3
CONCRETE PLACEMENT & TREATMENT
Concrete is poured into the forms to the desired thickness.
CONCRETE CONSOLIDATION
Concrete vibrators are used to level concrete and remove entrapped air. This process helps ensure consolidation under and around embedded items.
RECOMMENDED PRODUCTS: CONCRETE VIBRATORS
4
ERECTING & BRACING
Panels are raised by a crane, moved into position, set on the foundation, and adjusted into final placement with shims. Once a panel is in place, temporary braces are set to support the panel until the roof is attached.
DRILLING FOR ANCHOR
Rotary hammer is used to drill a hole for the anchor that will secure the brace.
RECOMMENDED PRODUCTS: ROTARY HAMMERS
ANCHOR FASTENING
Impact Wrench is used to fasten the panel brace to the floor.
RECOMMENDED PRODUCTS: IMPACT WRENCHES
5
FINISHING & CLEAN-UP
Various trades visit the job site to complete the interior and exterior of the structure.
CONTROL &EXPANSION JOINT CUTTING
Expansion joints are made to allow for the dynamic movement of the concrete that occurs due to ambient temperature variances and/or movement of the soil from seismic activity.
SLURRY CLEAN-UP
Vacuums and dust extractors can be used to remove slurry created during polishing, cutting, or grinding.
RECOMMENDED PRODUCTS: VACUUMS
REMOVING IMPERFECTIONS AND OVER POURS
During the pouring process, concrete may cure in an imperfect manner if a form dislodges. Those imperfections are then removed first with demolition or rotary hammers.
RECOMMENDED PRODUCTS: DEMOLITION HAMMERS, ROTARY HAMMERS
CAULKING JOINTS & FILLING CRACKS
CONCRETE SURFACING
After removing imperfections, the panel is smoothed with angle grinders or concrete planers.
RECOMMENDED PRODUCTS: ANGLE GRINDERS, CONCRETE PLANERS
CLEAN-UP
Prepare the surface by removing debris.